ITER members share hardware procurements for the design and construction of this international fusion project. The overall scope of the hardware contributions that the United States is providing is more than 54% complete.
U.S. hardware contributions to the ITER project include design and fabrication for 12 technical systems and for instrumentation and controls for multiple systems:
US Hardware
- Central Solenoid
- Diagnostics
- Disruption Mitigation System
- Electron Cyclotron Heating Transmission Lines
- Instrumentation and Controls
- Ion Cyclotron Transmission Lines
- Pellet Injection (Fueling) System
- Port Integration
- Steady State Electrical Network
- Tokamak Cooling Water System
- Tokamak Exhaust Processing System
- Toroidal Field Coil Conductor
- Vacuum Auxiliary and Roughing Pumps Systems