Demonstrate the scientific and technological feasibility of fusion energy:
Fusion gain up to a Q of 10
Fusion power up to 500 megawatts
Long-pulse duration of 400-3,000 seconds
Deuterium-tritium (DT) fuel cycle with testing
US ITER is a DOE Office of Science project managed by Oak Ridge National Laboratory
Demonstrate the scientific and technological feasibility of fusion energy:
Fusion gain up to a Q of 10
Fusion power up to 500 megawatts
Long-pulse duration of 400-3,000 seconds
Deuterium-tritium (DT) fuel cycle with testing