Third module joins the central solenoid stack
On April 11, 2024, the third central solenoid module was successfully lifted and positioned in the ITER assembly hall on top of the existing two-module stack. A 325-millimetre offset provides room for equipment and connection work to be completed before the module is placed in its final position, aligned on the central solenoid axis. The next […]